Tuesday, March 5, 2013


Ottawa rewrites fighter jet plan with upgrades to extend CF-18 lifespan Add to ...

Click Here
Ottawa has added a twist to its long-running effort to buy new fighter jets, opening the door to new spending on upgrades that would prolong the lifespan of its fleet of CF-18s while further delaying a decision on the controversial process according to government documents and sources.
A change in the procurement document that is made available to potential suppliers invites manufacturers to propose new scenarios for maintaining and renewing Canadian air power.
Sources said the changes in the eligible options make it easier for manufacturers to propose a “mixed fleet” of upgraded CF-18s and other fighter jets, or a later delivery of new jets as the CF-18s fly beyond their planned phase-out.
The new proposal is the latest shift of position by the Harper government after last year’s highly critical report by Auditor-General on a planned sole-sourced purchase of 65 F-35 fighters.
The government has hit the “reset button” on that troubled, $40-billion file, but it remains a moving target – an ongoing irritant to a Conservative government that prides itself on fiscal responsibility.
The government – through the National Fighter Procurement Secretariat, created in the aftermath of the Auditor-General’s report – is going through an “options analysis” to determine which scenarios meet its needs.
The changes are among a number of new elements in the final version of the secretariat’s questionnaire to five aerospace firms, which is designed to obtain technical information on the aircraft in the running for the contract. Another questionnaire is in the works to obtain financial information on all fighter jets, but that one has also undergone significant changes that stand to further delay the process.
There is no firm timeline for the acquisition, but there is speculation in Ottawa that the government will want to delay the final announcement until after the 2015 general election.
The firms in the running for the contract have launched lobbying and public-relations campaigns to position themselves in the event that Ottawa launches a full-blown open competition for new fighters. The most vocal manufacturers have been Lockheed Martin, which is touting its F-35 as a full technological generation ahead of its rivals, and Boeing, which argues that its Super Hornet offers better overall capabilities than the F-35 at half the cost. The other firms in the running are Saab (Gripen), Dassault (Rafale) and Eurofighter (Typhoon).
The CF-18s first entered into service in 1982, and are currently programmed to be phased out between 2017 and 2023. A source who has been briefed on the ongoing replacement process said Ottawa could push back the acquisition of new jets as it contemplates the “capabilities, costs and risks” of all of its options, including “extending the CF-18.”
“It could provide the government with the opportunity of delaying the acquisition. If the government decides that it prefers to wait, it will have that option,” the source said.
The government said that the upgrades could allow manufacturers to prolong the lifespan of the CF-18s as a “bridge” to the delivery of new fighters later in the decade.
“Extending the CF-18 is consistent with the commitment to examine all options, including bridging options,” Public Works spokeswoman Lucie Brosseau said.
The government has added a new line in the questionnaire that will seek to gauge whether the aircraft capabilities that are being promoted by the various manufacturers are based on “test flights, simulators or past deployments.” The question is particularly relevant in terms of the F-35, which is still in development, while the other aircraft in the running are already operational.
The government has also made it clear that the fighter jets are being purchased “first and foremost” to defend Canadian soil. In the draft version of the questionnaire, Ottawa called for the new aircraft to contribute to the efforts of the Canadian Forces to defend Canada and North America, and contribute to international peace and security, without clearly prioritizing Canadian sovereignty.
The new emphasis on Canadian sovereignty could have a greater impact on the F-35, which is deemed by some experts to be the most effective fighter in international coalition alongside the American military. However, rival manufacturers have been boasting that a twin-engine jet such as Boeing’s Super Hornet offers superior performances on Canadian soil, such as Arctic patrols.
The procurement secretariat has yet to state when it will send out a second questionnaire seeking financial information from the five manufacturers.
The draft version of the document called on the firms to provide “estimates of the full life-cycle cost of the aircraft,” which would have entailed a thorough estimate including acquisition, sustainment and operations budgets for four decades. However, the government will now only seek “cost estimates of the aircraft,” which will not allow for a full financial comparison of the rival fighters.
The financial questionnaire will also not include any questions on the regional benefits that would flow from the purchase. Instead, the government said it will seek the information “later in the process.”

Wednesday, February 27, 2013


Pentagon F-35 program chief lashes Lockheed, Pratt
Wed, Feb 27 19:03 PM EST
image
WASHINGTON (Reuters) - The Pentagon program chief for the F-35 warplane slammed the main contractors on the program, Lockheed Martin (LMT.N) and Pratt & Whitney, on Wednesday, accusing them of trying to "squeeze every nickel" out of the U.S. government and failing to see the long-term benefits of the project.
U.S. Lieutenant General Christopher Bogdan made the comments during a visit to Australia, where he has sought to convince lawmakers and generals to stick to a plan to buy 100 of the jets, an exercise complicated by the second grounding of the plane this year and looming U.S. defense cuts.
Pratt & Whitney, a unit of United Technologies Corp (UTX.N), is sole supplier of engines to the $396 billion F-35, or Joint Strike Fighter. Lockheed Martin provides the body of the radar-evading jet, the most expensive combat aircraft in history.
"What I see Lockheed Martin and Pratt & Whitney doing today is behaving as if they are getting ready to sell me the very last F-35 and the very last engine and are trying to squeeze every nickel out of that last F-35 and that last engine," Bogdan told reporters at the Australian International Airshow in southern Victoria state.
"I want them both to start behaving like they want to be around for 40 years," he added. "I want them to take on some of the risk of this program, I want them to invest in cost reductions, I want them to do the things that will build a better relationship. I'm not getting all that love yet."
Lockheed Martin said it was "singularly focused" on properly executing its contracts to develop, produce and sustain the new warplane, and insisted it was on track to finish development by 2017.
"We do this in partnership with Lieutenant General Bogdan and the entire JSF Program Office and strive daily to drive costs out of the program," said spokesman Michael Rein.
He said the company had reduced costs by 50 percent since the first production airplanes were built, and remained confident that the sixth and seventh production deals, currently under negotiation, would result in further savings.
Pratt & Whitney had no immediate comment.
Bogdan caused a stir shortly after joining the F-35 program last August when he described the relationship between the government and Lockheed Martin as the worst he'd ever seen. There had been little improvement since then, he said.
"Are they getting better? A little bit," he said. "Are they getting better at a rate I want to see them getting better? No, not yet."
If the project stays on track, Pratt & Whitney will eventually provide 4,000 engines and Lockheed Martin 3,000 planes.
The Pentagon plans to buy 2,443 of the warplanes in the coming decades, although many analysts believe U.S. budget constraints and deficits will reduce that number.
Australia, a close American ally, is considering doubling its fleet of 24 Boeing Co (BA.N) F/A-18 Super Hornets amid delays and setbacks in the F-35 project. That means Canberra could buy far fewer F-35s than initially planned.
LEAKS
Bogdan was also critical of what he suggested were leaks from Pratt & Whitney's camp about the engine issue, which led the Pentagon to suspend F-35 flights last Friday.
Two sources told Reuters that Pratt & Whitney is 99 percent sure the fan blade problem that grounded the jets was not caused by high-cycle fatigue, which could force a costly design change, and the aircraft could be flying again within the week.
"Until all those tests are done and I see the results, I don't know what's going on," Bogdan said. "However ... my gut would tell me it's on the spectrum of the minor side - 99 percent is bold, flying next week is bold."
Bogdan also gave the example of taking six months to close a deal with Pratt & Whitney for engines on its fifth bloc of jets, shortly after General Electric Co (GE.N) had been dropped as a second supplier of engines for the program, leaving Pratt & Whitney as sole supplier for the next 40 years.
"Now, you would think a company like Pratt & Whitney that was just given the greatest Christmas gift you could ever, ever get for a company would act a little differently," Bogdan said.
Bogdan is flying back to the United States this weekend, just in time to hear about the future of U.S. military budgets, which are slated to be cut by nearly $500 billion over the next decade, an amount which could double unless Congress acts in the next week to avert spending reductions known as "sequestration".

Saturday, February 23, 2013


U.S. grounds entire F-35 fighter fleet after cracked engine blade found in plane

A U.S. Navy F-35 Joint Strike Fighter Lightning II takes off in 2006.
U.S. Navy handout/AFP/Getty ImagesA U.S. Navy F-35 Joint Strike Fighter Lightning II takes off in 2006.
WASHINGTON — The Pentagon on Friday grounded its fleet of F-35 fighter jets after discovering a cracked engine blade in one plane.
The problem was discovered during what the Pentagon called a routine inspection at Edwards Air Force Base, Calif., of an F-35A, the Air Force version of the sleek new plane. The Navy and the Marine Corps are buying other versions of the F-35, which is intended to replace older fighters like the Air Force F-16 and the Navy F/A-18.
All versions — a total of 51 planes — were grounded Friday pending a more in-depth evaluation of the problem discovered at Edwards. None of the planes have been fielded for combat operations; all are undergoing testing.
In a brief written statement, the Pentagon said it is too early to know the full impact of the newly discovered problem.
The F-35 is the Pentagon’s most expensive weapons program at a total estimated cost of nearly $400 billion. The Pentagon envisions buying more than 2,400 F-35s, but some members of Congress are balking at the price tag.
Friday’s suspension of flight operations will remain in effect until an investigation of the problem’s root cause is determined.
The Pentagon said the engine in which the problem was discovered is being shipped to a Pratt & Whitney facility in Connecticut for more thorough evaluation.